Preparation of tender design & documents, project management and Contract administration of Chianwali (5.38MW) Hydropower Project
Project Name:
Preparation of tender design & documents, project management and Contract administration of Chianwali (5.38MW) Hydropower Project
Location Country/ Province/ Division:
RD 130+000, Uper Chenab Canal Lower, Punjab, Pakistan.
Client:
Irrigation & Power Department Government of Pakistan.
Implementation Start / Expected Completion:
May, 2009 to June 2016
This is a run of river type hydropower project. The project site is located at RD 130+000 of Upper Chenab Canal Lower approximately 600 in downstream of existing fall structure at RD 128+00 in the bed of the canal towards the left bank of the canal and about 8 km from Gujranwala Town. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The powerhouse is equipped with two Horizontal Kaplan Turbines with a capacity of 5.4MW. The available design discharge is 150m3/s, and rated head net 4.3m. The total energy output will be 32.7 GWh and the implementation time is estimated as 52 month.